top of page
Project 1: Industrialised Building System
For the first project, we were tasked to work in groups and study the IBS method of construction in depth. Our given system was 'Precast Concrete' and had to design a residential block and calculate the IBS score of the building as well as provide a component schedule with the measurements for all precast components..
Project 2: Construction Solutions
The second project was aligned with our Studio Design IV and the aim is to make sure we paid attention to the construction methods of our proposed design. We were tasked to look for precedent studies, taking into consideration the façade systems, roof system and materiality that best suited our designs.
bottom of page